Faqs_Questions_And_Answers Faqs_Questions_And_Answers Faqs_Questions_And_Answers Faqs_Questions_And_Answers Faqs_Questions_And_Answers Faqs_Questions_And_Answers Faqs_Questions_And_Answers
Faqs_Questions_And_Answers Faqs_Questions_And_Answers Faqs_Questions_And_Answers Faqs_Questions_And_Answers Faqs_Questions_And_Answers Faqs_Questions_And_Answers
Seo Training In Hyderabad
Interview Questions
Action Script Questions
Accounting Questions
AJAX Interview Questions
C Language Questions
C++ Language Questions
Date Structures Questions
Date Base Questions
Desktop Publishing Questions
Data Ware Housing Questions
Hacking Interview Questions
Hibernate Interview Questions
Java Interview Questions
J2ee Interview Questions
Mainframes Questions
MIS Questions and Answers
Multimedia Career Questions
Marketing Questions
.NET Interview Questions
OOPS Questions and Answers
Open Source Questions
Oracle Apps Questions
PHP Interview Questions
People Soft Questions
Perl Scripting Questions
SAS Interview Questions
SAP Interview Questions
Seo Interview Questions
Security Interview Questions
Sql Server Interview Questions
Springs Interview Questions
Shell Scripting Questions
Testing Tools Questions
Web Sphere  Questions
Web Designing  Questions
Web Logic Server Questions
XML Questions and Answers
PP
11 What is the procedure to insert an inspection checkpoint at the end of an operation?
Ans:

The procedure to insert an inspection is by defining it in the process sample, assign inspection type 03 in the Material Master then create MIC and assign them in the Routings. Then the system automatically generates the Inspection Lots.

12 What is used to generate reports in SAP for a list of material requirements from LTP?
Ans:

To generate the reports for the list of material required for LTP is by using MS70 and then use MCEC.

13 What is the parameter used to specify the teardown time in one operation?
Ans:

The teardown time in one operation can be defined by one of the Standard Parameter.

14 How to get planned orders scheduled for scheduling planned order for capacity leveling?
Ans:

The planned orders scheduled for scheduling planned order while running MRP, by selecting 2 in the scheduling box this will bring planned orders into CM01 and CM02.

15 When both labor, Machine categories exist how does process time is calculated in WC?
Ans:

When both labor, Machine categories exist scheduling is done based on the Capacity Category it is defined at Work center.

16 General Data that contains in Basic Data Screen are?
Ans:

General data that contains in basic data screen are Material Number, Material Description and Base Unit of Measure.

17 How to navigate for creating object dependencies in a BOM for configurable materials?
Ans:

Navigation for creating object dependencies in a BOM is for configurable materials is Go to Extras>Object Dependency>Assign.

18 Explain me why work scheduling view is required for semi finished and finished products?
Ans:

Work Schedule view is required for semi finished and finished products because all the details are mentioned in MRP views and they are also available for production for scheduler and production scheduler profile in this view, if not maintained conversion of planned order to production will not be possible.

19 Which transaction code is used for creating material master?
Ans:

MM01 is the transaction code for creating material master.

20

What is the procedure when a program is run for capacity planning Transaction code CM01 and where the plan orders are not included in the pegged requirements, even checked the profile and the check box for order and plan order are all activated?

Ans:

When the planned orders have been created without capacity requirement indicator in MRP “2” lead time scheduling, in such case they would be converted to process orders they will have impact on the resource. If the planned orders, re-run the MRP or change in every planned order, going to the menu and edit the Scheduling. Another possibility is to do with routing/work centers used and whether it is actually calculates consumption of capacity of the category at the work center being displayed in CM 01, it may consume a capacity pool or it may not consume the category.

 